Turn your spreadsheet into projects and tasks
No export from another tool, no templates. Upload your sheet as it is and see what will be created before it is.
Importing is available on paid plans and during the free trial, 14 days with no credit card
Your project plan lives in a spreadsheet that everyone can open and nobody reliably owns. A row can name a task, a date, and even a person, but the file does not follow up with the owner, send a task notification, or reveal who stopped checking it. Once updates depend on someone remembering to ask, the sheet becomes a record of what was typed rather than a system that moves the work. A cell goes stale quietly, and nobody knows whether its owner is working or never saw it.
Upload the Excel or CSV file as you wrote it, without copying data into a new template. The importer recognizes Arabic and English headers for task, description, status, assignee, and due date, then uses a project column or the sheet name to form projects. The preview asks you to match every owner name yourself and shows title changes before confirmation. Formulas are not transferred, but the values saved in xlsx cells are read.
The result? Rows become assignable, trackable tasks, and the plan leaves a file that waits to be opened for a workspace where each participant can see the work that belongs to them. One Sheet can contain several projects through Project values, or each Sheet can become a project bearing its own name. Phase forms a task list when selected, a recognized Status sets completion, and Description, Tags, and Priority remain readable beside the row that created the task.
What becomes what
Fareeqy has three levels and no fourth: project, task list, task.
| Spreadsheet | Fareeqy |
|---|---|
| The sheet, or a project column | Project |
| A list or stage column, or whatever you choose | Task list |
| The row | Task |
| A Task or Title column | The task title |
| An Assignee or Owner column | A member you match in the preview |
| A Done or Complete status | A completed task |
What may surprise you about Spreadsheet
Spreadsheet formulas are not recreated or calculated in Fareeqy. For an xlsx file, the reader takes the cached value stored in the cell, the result the workbook saved for display. That value can become task text or another recognized field, but the formula, its references, formatting, colors, images, and cell comments remain outside the imported project.
How to prepare your spreadsheet
From Excel or Numbers
Save the file in a format we read:
File → Save As → .xlsx
Or CSV UTF-8 if your sheet is simple. Each sheet in the file becomes its own project, named after it.
From Google Sheets
From the File menu:
File → Download → Microsoft Excel (.xlsx)
Download the file and upload it. Do not paste a share link: the link needs your account's permission and we read nothing from it.
Accepted formats: CSV, Excel, or ZIP. You can upload several files together in one go.
What comes across, and what does not
Comes across
- A task name column, the only one that is required
- A status column, where done or complete arrives as a finished task
- An assignee column, by the name as you wrote it, and the preview asks who that is on your team
- A due date column, in any format your sheet understands
- A description column, which becomes the task's notes
Does not come across
- Formulas, colours, images and in-cell comments. Only the text is read.
- The old xls format. Save the file as xlsx or CSV instead.
Before you start
The only requirement is that the first row is your column headers, and that one of them is the task name. Every other column is optional.
How the import runs
Nothing is written until you approve it
Upload the file and we read it, then show you exactly what would be created: how many projects, task lists and tasks, every title we would have to rename, and every person on your board. Only the confirm button creates data.
Duplicate titles are settled in front of you
Your board has three cards called Follow up, and the board's own name may already belong to a project you made last year. We rename, and every rename is on screen before you confirm, not after.
Upload the same export again safely
Re-exported after another week of work? Upload it again. What you imported before keeps your edits, and only what is new is added. This is a migration tool, not a two-way sync, so an import never overwrites what you changed inside Fareeqy.
The file stays yours
Delete it from the import page whenever you want. Forget about it and we delete it automatically after 30 days.
Frequently asked questions
Which columns does my sheet need?
My file has several sheets. What happens?
Can I paste a Google Sheets link?
Does the Excel and Google Sheets import understand Arabic headers?
Yes. The importer recognizes headers such as the Arabic words for task, task name, description, status, assignee, and due date, alongside their English equivalents. Only the task-name column is required; the others are optional. Matching does not depend on a fixed column order, so your familiar sheet layout can stay intact. If a header is unknown, we do not guess its meaning and attach it to a field you may not have intended.
Matching normalizes letter forms and whitespace, then ignores Arabic diacritics and elongation while comparing a header, allowing two written forms of the same word to behave alike. The reader knows practical aliases: Title or Item can name a task, Responsible or Assigned To can name its owner, and Due or Deadline can carry the date. Arabic and English headers can appear in the same file when a bilingual team naturally mixes them.
A Project column determines how workbook sheets relate to projects. When it exists, one sheet can contain rows for several projects and the values split them accordingly. Without it, each Sheet name becomes an independent project name. A CSV uses its file name for that level. The reader excludes the selected grouping column from project naming, preventing every phase value from becoming a project with only one list, then exposes the result in preview before creating any record.
Other columns can shape the import without forcing a template. Project or its Arabic equivalent separates rows into projects, while Section, Phase, or their recognized Arabic forms can create task lists. Status determines completion when it contains a known value. Tags and Priority text can remain in notes. Read the project, list, and person names in the preview before confirmation; that is where you verify that your own headers meant what the reader understood them to mean.
How does Fareeqy read an Excel date stored as a number?
Excel sometimes stores a date as a serial number rather than visible text inside the xlsx file. The reader recognizes a number in a realistic date range and converts it into the task's due date. It also understands common date formats from CSV files saved under different regional settings. If one value is malformed or cannot be read safely, that task remains without a due date instead of causing the entire spreadsheet import to fail.
The reader also handles a common device-setting difference. Excel in a comma-decimal locale may save CSV with semicolons between columns, so delimiter detection prevents the whole row from landing in one cell. Arabic and Western encodings are tried after UTF-8 when the file does not identify itself clearly, protecting task names from turning into unreadable symbols. ISO dates, month-name formats, and day-before-month forms from common exports are recognized.
Not every number is treated as a date because an Estimate, cost, or order identifier may sit nearby. Conversion is applied to the due-date field and accepted only within a realistic calendar range. Separately, Status values such as done, complete, and their recognized Arabic equivalents can mark completion. The formula that produced an xlsx date does not transfer; only the value cached when the workbook was saved arrives. Save after the latest recalculation before uploading.
What Teams Say About Project Management with Fareeqy
One of the nicest, most pleasant experiences I've had managing teams. Fareeqy stands out for being simple, easy, and uncomplicated.
And the most important feature is scheduling your work and tasks around prayer times, not the other way around!Honestly, I love using Fareeqy,
First, the project organization part, and its reminders if there are overdue tasks.
Fareeqy is easy and straightforward. I don't need to read or watch any video to know how to use any feature; everything is straightforward, and that's what makes me like Fareeqy most.Move your work into Fareeqy today
Create your account, upload the export, and read the preview. Nothing is written to your account until you confirm.
Get Fareeqy Free